01
Rebuild only what needs it.
Keep usable media. Structure the content that needs regular editing. Agree the original allocation and orientation before design work.
Switch to Viewify
Start with your screens, content and current setup. Work out what can be reused, agree the changes and test the first screen before a wider rollout.
BEFORE THE CHANGE
A short check now saves a difficult handover later.
01
Record the screen and player models. Confirm which equipment you own, which is leased and whether the player is locked to another service.
02
Collect your menus, prices, logo, photos and source artwork. Confirm you can use them. A finished video or image can be uploaded, but editable prices may require a rebuild.
03
Check the contract, notice date and access you will retain. Keep the existing system available until the new first-screen test is complete.
CHOOSING THE RIGHT CONTENT
Uploaded images and videos can sit in a content playlist. Structured menu items go further: names, categories, prices and availability become fields your team can change.
A suitable MP4 can be uploaded as finished content after checking file size, encoding and playback on the player. Text inside that video is not an editable menu field. We can separately quote a structured menu rebuild if you need routine price and stock changes.
Possibly, if you own it, have the required access and it supports the tested Viewify player route. Do not wipe or return it before the equipment check and fallback plan.
Yes. Agree a first-screen pilot so you can check content, connectivity and the staff workflow before changing the remaining screens. Software, setup and any equipment costs are confirmed first.
THE HANDOVER
Start with one complete screen and a real update. Scale only after the setup works as intended.
01
Keep usable media. Structure the content that needs regular editing. Agree the original allocation and orientation before design work.
02
Check the design at viewing distance, delivery acknowledgement, saved playback and reconnection on the actual player.
03
Give staff the appropriate access. Practise price and sold-out changes, explain support and document the remaining rollout.
Tell us the current supplier, screen count and equipment models. We’ll set out the handover route.